Mill throughput improved by 46% with reduction of critical size particles by 11%

Case Study

Phu Kham Mine
Cancel

Overview

Location: Phu Kham Mine, Laos, Southeast Asia

Project Type: Copper, Gold, Silver Open pit mine

Products Used: E*STAR

Goals

  1. To increase the mill throughput by keeping the actual powder factor
  2. To reduce critical size particles
  3. Increase production of copper, gold and silver concentrate

The History

Phu Kham Mine is copper-gold-silver operation located in Laos, Southeast Asia. Annual digging rate in 2017 was cca 60M tons. Annual production in 2017 was 100 000 tons of copper, 40 000 oz of gold and 640 000 oz of silver.

Typical hard ore blast used following parameters: PF 1,6 kg/m3, hole diameter 200 mm, hole depth approx.. 11 m, burden 3,5 m, spacing 4,5 m, stemming 4 m, subdrill 1 m, explosive 70/30 bulk emulsion. There were no restrictions on PPV or AIR O/P. Non-electric detonators and typical timing was used.

The Challenges

First set of trials were done with same non-electric detonators / timing and increased powder factor. Standard powder factor was increased by 50 % to 2,4 kg/m3. Mill throughput was increased by 9 %, critical size amount was reduced by 8 % and fines amount was increased by 5%.

Second set of trials were done with the same powder factor and with E*STAR electronic detonators and with new timing inter-hole and inter-row delays. This set of trials was focused on calculation delay based on blast geometry, rock properties, explosive properties etc.

The Austin Solution

Typical hard ore blast, test blasts with increased PF and electronic tests blast were put in blast design modelling software called Paradigm. Based on inputs and software papers database, best timing (inter-hole and inter-row delay) was calculated and recommended.

The Outcome

  • Improved blast fragmentation
  • 46 % increment of mill throughput production
  • 11 % reduction of critical size amount (25 – 75 mm)
  • 14 % increment of fines (under 10 mm)
  • Heave / muckpile height reduction
  • Muckpile movement control
  • Increased safety and blasting control
  • Improved timing has bigger effect than increased powder factor

Major improvement, mill throughput increment, is shown in graph below. Black line is representing typical hard ore blast with PF 1,6 kg/m3, grey and yellow line is representing test blasts with PF 2,4 kg/m3 with the same non-electric timing and blue line is representing test blast with improved electronic timing and normal PF 1,6 kg/m3.

After finishing all tests, blasting operation has been switched to E*STAR electronic detonators in hard ore blasting.

logo_white

AUSTIN

DETONATOR

We are a traditional manufacturer of initiation systems for industrial blasting operations and an important technological and research base for production and further development of initiation systems.

Visit Site

AUSTIN POWDER

SERVICE CZ

Austin Powder Service CZ implements the latest technologies and products for blasting works, such as laser profiling, electronic modeling, and electronic detonators.

Cancel
logo_white

We use cookies to personalise and improve your site experience, to see how you use our website and to integrate with social media. You have the option to "Accept All Cookies" or "Reject Non-Essential Cookies". Please refer to our Privacy Policy for more details.

More Information